Scope of Works: Reconstruction of the Main Roundabout at the Whakatane River Bridge.

  • Design, approval, and implementation of a comprehensive Traffic Management Plan.
  • Installation and maintenance of environmental controls throughout the project.
  • Implementation of a site-specific Health and Safety Management Plan.
  • Site clearance and earthworks, including cutting to waste/fill, milling, and compaction testing.
  • Installation of drainage and concrete structures such as culverts, catchpits, manholes, vertical kerbs and channels, nib kerbs, reinforced concrete apron islands, splitter islands, concrete driveways, shared-use concrete footpaths, pram crossings, kerbs, and tactile pavers.
  • Site preparation using geofabric and grid separation layers, followed by subbase/subgrade and in-situ cemented layers.
  • Night shift pavement works, including the supply and installation of asphalt layers with a membrane seal, following NZTA specifications.
  • Completion of the project with line marking, road signs, streetlights, keystone retaining wall, topsoil, grassing, and bollard installation.

Project: Landing Road Roundabout Construction

Contract Value: $2.205M

Location: Intersection of Landing Road and Hinemoa Street, Whakatane.

Duration: September 2023 – December 2023

To ensure our pricing remains fair and reflects current fuel costs, we have implemented a temporary weekly review of our Fuel Adjustment Factor (FAF).

The Base rate is $1.380 per litre ex GST as at 3rd March 2026.  This rate will be recalculated each Monday and published on our website, providing customers with full visibility and transparency.

Temporary FAF Rate

Week:                   24/08/2026 – 30/08/2026

Cartage:                13.38%

Quarry:                 6.36%